Jeff is planning to do everything on his own including the plumbing and electrical (with the help of a few friends that can fit under the house). He is currently in the plumbing stage after demolition, foundation building, and framing. Once the plumbing is complete, it will really start to take shape.
Here is what it looks like right now.
This is what it looked like outside before the demolition took place:
The whole area behind this wall was our master closet. What are doing for a closet now? Welp, Jeff already took care of that. I'll post about our new closet soon.
And here ia a digital mock up of the general layout for the bathroom. It will be tight, but I think it fits with the size of our house. And a small bathroom is better than no bathroom, right?
No comments:
Post a Comment